2009 - 2010 Internal Connections - Wireless Access Points

Wireless Access Points

With Sufficient Coverage for Groveton ISD Facilities

Installation and Configuration

 

Proposal is for Wireless Access Points of Sufficient Coverage to allow connectivity throughout the contiguous Groveton ISD campuses.

Installation and configuration to existing Groveton ISD network.

3 Year On-site Warranty

Vendor facilitation of any manufacturer's warranties.

Proposal should be structured with the intent of the vendor to integrate with Network Drops proposal, Switchesproposal and Servers proposal. All require installation and configuration to Groveton ISD's existing network. Proposal should detail the extent of the configuration.

Buildings open for inspection January 5th, 2009.

Walk-through required for valid bid proposal.

Proposals due January 15, 2009.

Responses to:

David Fant

Technology Director Groveton ISD

david_fant@grovetonisd.net

Send contact information if you want a response by phone.

 

 

Home | Calendar | Faculty/Courses | Directory | Extracurriculars | Library | Homework Help | My Site | Log on | Site Map
Guidance/Counseling | Health Clinic | Food Service | Newspaper | Yearbook | Photo Gallery
PTO | About Us | FAQs | Contact Us | Site Visitor's Guide | Bug Bounty | Webmaster
Add an Announcement | Add a Calendar Event | Create a Photo Gallery | Create a Profile | Suggestions

 

Translate page:

© Copyright 2010 - Groveton ISD

Powered by School Site Manager