2009 - 2010 Internal Connections - Wireless Access PointsWireless Access Points With Sufficient Coverage for Groveton ISD Facilities Installation and Configuration |
Proposal is for Wireless Access Points of Sufficient Coverage to allow connectivity throughout the contiguous Groveton ISD campuses. Installation and configuration to existing Groveton ISD network. 3 Year On-site Warranty Vendor facilitation of any manufacturer's warranties. Proposal should be structured with the intent of the vendor to integrate with Network Drops proposal, Switchesproposal and Servers proposal. All require installation and configuration to Groveton ISD's existing network. Proposal should detail the extent of the configuration. Buildings open for inspection January 5th, 2009. Walk-through required for valid bid proposal. Proposals due January 15, 2009. Responses to: David Fant Technology Director Groveton ISD Send contact information if you want a response by phone.
|
Home
| Calendar
| Faculty/Courses
| Directory
| Extracurriculars
| Library
| Homework
Help
| My Site
| Log on
| Site
Map
|
||
| ||
© Copyright 2010 - Groveton ISD |
Powered by School Site Manager | |